Author:
Gao Zhendi,Ji Mingjun,Kong Lingrui,Hou Xinhao
Funder
National Natural Science Foundation of China
Reference36 articles.
1. An integrated berth allocation and yard assignment problem for bulk ports: formulation and case study;Al-Hammadi;RAIRO Oper. Res.,2017
2. A reclaimer scheduling problem arising in coal stockyard management;Angelelli;J. Sched.,2014
3. Finding efficient make-to-order production and batch delivery schedules;Bachtenkirch;European J. Oper. Res.,2022
4. A follow-up survey of berth allocation and quay crane scheduling problems in container terminals;Bierwirth;European J. Oper. Res.,2015
5. Optimizing the hunter valley coal chain;Boland,2012
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献