1. Discrimination of hot versus cold avalanche deposits: implications for hazards assessment at Mount Meager, British Columbia;Stewart;Curr Res—Geol Surv Can,2001
2. Boultbee N, Robson O, de Batz R, Moalli S, Humphries R. Tunnelling through recent unconsolidated volcanic deposits at the Upper Lillooet Hydro Project, Pemberton, BC, Canada. In: Proceedings of the Word Tunnel Congress 2017—Surface Challenges—Underground Solutions; 2017 Jun 9–15; Bergen, Norway; 2017.
3. Volcanology of the 2350 BP eruption of Mount Meager Volcanic Complex, British Columbia, Canada: implications for hazards from eruptions in topographically complex terrain;Hickson;Bull Volcanol,1999
4. Revised stratigraphy of the Pebble Creek Formation, British Columbia: evidence for interplay between volcanism and mountainous terrain;Stewart;Curr Res—Geol Surv Can,2002
5. Bonin G, Lillico B, Robson O, de Batz R, Moalli S. Cover grouting through unconsolidated deposits at the Upper Lillooet Hydro Electric Project, Pemberton, BC, Canada. In: Proceedings of the Word Tunnel Congress 2017—Surface Challenges—Underground Solutions; 2017 Jun 9–15; Bergen, Norway; 2017.