1. Haliade-X wind turbine technical specifications [Internet]. Paris: GE Renewable Energy; c2021 [cited 2021 Mar 23]. Available from: https://www.ge.com/renewableenergy/wind-energy/offshore-wind/haliade-x-offshore-turbine.
2. GE’s Haliade-X 14 MW turbine to debut at Dogger Bank C [Internet]. Port of Tyne: Dogger Bank Wind Farm; 2020 Dec 18 [cited 2021 Mar 23] Available from: https://doggerbank.com/press-releases/ges-haliade-x-14mw-turbine-to-debut-at-dogger-bank-c/.
3. Voltaire offshore jack-up installation vessel. Aalst: Jan De Nul.
4. Moore J, Bullard N. BNEF executive factbook—power, transport, buildings and industry, commodities, food and agriculture, capital. London: BloombergNEF; 2021 Mar.
5. Powered by change: Siemens Gamesa launches 14 MW offshore direct drive turbine with 222-meter rotor [Internet]. Zamudio: Siemens Gamesa; 2020 May 19 [cited 2021 Mar 23]. Available from: https://www.siemensgamesa.com/en-int/newsroom/2020/05/200519-siemens-gamesa-turbine-14-222-dd.