1. An exact algorithm for batching and scheduling two part types in a mixed shop: A technical note;Cheng;International Journal of Production Economics,1998
2. Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times;Cheng;Computers Operations Research,2009
3. Makespan minimization in the two-machine flowshop batch scheduling problem;Cheng;Naval Research Logistics,2000
4. J.W. Herrmann, C.Y. Lee, Three-machine look-ahead scheduling problems, Research Report No. 92–93, Department of Industrial Engineering, University of Florida, FL, 1992.
5. F.J. Hwang, M.Y. Kovalyov, B.M.T. Lin, Minimization of total completion time in flowshop scheduling subject to fixed job sequences, in: Proceedings of the 12th International Conference on Project Management and Scheduling, Tours, France, 2010, pp. 249–252.