1. The post-combustion capture pilot plant Niederaussem – results of the first half of the testing programme;Moser;GHGT10. Energy Procedia,2011
2. Enhancement and long-term testing of optimized post-combustion capture technology – Results from the second phase of the testing programme at the pilot plant Niederaussem;Moser;GHGT-11. Energy Procedia,2013
3. Jovanovic, S., Stoffregen, T., Clausen, I., and Sieder, G., Topical Report: Techno-economic analysis of a 550 MWe sub-critical PC power plant with CO2 Capture, Project DE-FE0007453, May 4, 2012.
4. Krishnamurthy, K.R., Slipstream pilot scale demonstration of a novel amine-based post-combustion capture technology for CO2 capture from coal-fired power plant flue gas, Project DE-FE0007453, Project continuation request for initiating Budget Period 3 tasks, June 9, 2014.