1. J. Yang, Construction Project Schedule Control, Beijing: Earthquake Publisher, 1995.
2. J. W. Zhang Jingwen, Y. Xu and Z. W. He, etc, “A Review on the Time/Cost Trade-Offs Problem in Project Scheduling” Journal of Industrial Engineering and Engineering Management, vol. 1, no. 21, pp. 92-97, 2007.
3. J. W. Zhang Jingwen, Y. Xu and Z. W. He, “Discrete Time/Cost Trade-offs in Project Scheduling with Time-switch Constraints” Chinese Journal of Management Science, vol. 2, no. 14, pp. 58-64, 2006.
4. X. L. Wu and Z. Yin, “Solving time-cost trade-off model for activity network by minimum cost flow principle” Journal of Huazhong University of Science and Technology(Nature Science Edition), vol. 1, no. 35, pp. 42-45, 2007.
5. S. E. Elmaghraby, “On criticality and sentivity in activity networks” European Journal of Operational Research, vol. 127, pp. 220-238, 2000.