1. Xiangdong Wu, Guowei Zhang, “Ice and snow disaster on the electic power grid and preventive measures,” China electric power. China, 41(12),14-18, 2008.
2. State Grid Copration, 2008.Q/GDW 182-2008:2008.Technical code of design overhead Transmission line in medium-heavy icing area.Beijing: State Grid Corporation. .
3. Jiazheng Lu, Jiwen Peng, Hongxian Zhang, “Icing Meteorological Genetic Analysis of Hunan Power Grid in 2008,”Electric power construction.China,vol.30(6),pp.29-32,2008. .
4. Song Gao, Yushan Ding, 2004. “Mechanical calculation and construction of overhead lines”. Beijing:China electric power press. .
5. Diansheng Zhang, 2004.“Electrical Engineering handbook of desiging high voltage transmission line, 2nd ed” Beijing:China Electric Power Press. .