1. CESAR collaborative research project under the EC 7th framework programme. www.CO2CESAR.eu.
2. J.N. Knudsen, P.-J. Vilhelmsen, O. Biede, J.N. Jensen, CASTOR 1 t/h CO2 absorption pilot plant at the Elsam Kraft A/S Esbjerg power plant — First year operation experience. 8th International Conference on Greenhouse Gas Control Technologies; 19.06.2006–22.06.2006, Trondheim, Norway.
3. Experience with CO2 capture from coal flue gas in pilot-scale: Testing of different amine solvents. GHGT-9;Knudsen;Energy Procedia,2009
4. A simulation study of alternative process configurations for a CO2 absorption plant using CO2SIM. GHGT-9;Tobiesen;Energy Procedia,2009
5. S. Reddy, Econamine FG Plussm Technology for Post Combustion CO2 Capture. Fluor Corporation, 11th meeting in the IEA international post combustion capture network, May 20–21, 2008, Vienna, Austria..