1. Swart, D (July 2006). End of Well Reports Heerlerheide #1 & Heerlerheide #, Groningen, the Netherlands, PGMi.
2. Van Tongeren, P.C.H., Amann – Hildenbrand, A & Daneels, A. (April 2007). The Selection of ‘low’ and ‘the intermediate’ temperature wells (HRL-1, -2 & -3) at the Heerlen mine water-project, Mol, Belgium. VITO NV.
3. Watzlaf G.R. & Ackman, E.T. (2006). Underground Mine Water for Heating and Cooling using Geothermal Heat Pump Systems. Pittsburgh, USA. IMWA Springer-Verlag.
4. Laenen, B, Harcouet-Menou V, & De Boever, E. Proposal pump test HLN2 – HLN3, Mol, Belgium, February 24, 2012. VITO NV.
5. Laenen, B, Harcouet-Menou V, & De Boever, E. Evaluation impact of various supply scenarios on the mine water reservoirs, Mol, Belgium, march, 2013. VITO NV.