Author:
Jo Sung-Ho,Park Young Cheol,Moon Jong-Ho,Lee Sujin,Han Sang Phil,Yi Chang-Keun
Reference9 articles.
1. Korea Institute of Energy Research. KIERDRY. Trademark 40-1131847. 2015.09.23.
2. Continuous operation of the potassium-based dry sorbent CO2 capture process with two fluidized-bed reactors;Yi;Int J Greenh Gas Control,2007
3. Long-term operation of carbon dioxide capture system from a real coal-fired flue gas using dry regenerable potassium-based sorbents;Park;Energy Procedia,2009
4. Demonstration of pilot scale carbon dioxide capture system using dry regenerable sorbents to the real coal-fired power plant in Korea;Park;Energy Procedia,2011
5. Park YC, Jo SH, Lee DH, Yi CK, Ryu CK, Kim KS, You CH, Park KS. The status of the development project for the 10 MW-scale dry-sorbent carbon dioxide capture system to the real coal-fired power plant in Korea. Energy Procedia 2013;37:122-6.
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献