Author:
Alam MD Jahedul,Habib Muhammad Ahsanul,Quigley Kevin
Reference34 articles.
1. Apipattanavis, S., Sabol, K., Molenaar, K. R., Rajagopalan, B., Xi, Y., Blackard, B., Patil, S. 2010. Integrated Framework for Quantifying and Predicting Weather-Related Highway Construction Delays. Journal of Construction Engineering and Management.
2. Project Scheduling Using Fuzzy Set Concepts;Ayyub;Journal of Construction Engineering and Management,1984
3. Causes of Delay in the Construction Industry;Baldwin;Journal of the Construction Division, American Society of Civil Engineers,1971
4. Canadian Weather. Government of Canada. https://weather.gc.ca/canada_e.html. [Accessed July 12, 2015].
5. A fuzzy approach to construction project risk assessment and analysis: construction project risk management system;Carr;Advances in engineering software,2001
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献