Author:
Sturova Maria,Novik Anatoliy,Radaev Anton,Shangutov Anton
Reference20 articles.
1. Exploring critical road project delay factors in Ghana;Amoatey;Journal of Facilities Management,2017
2. Empirical assessment of the likelihood and duration of highway project time delays;Anastasopoulos;Journal of Construction Engineering and Management,2012
3. Underground Streets in Residential Area: Aspects of Design on the Example of Russia;Anishchenko;Lecture Notes in Civil Engineering,2020
4. Delay risk assessment models for road projects;Antoniou;Systems,2021
5. Artun, A., Badenko, V., Volkova, Y., Radaev, A., 2020. Minimizing earthwork volumes by optimizing vertical alignment with linear programming algorithm. E3S Web of Conferences 224, 03028. https://doi.org/10.1051/e3sconf/202022403028
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Identification of anomaly of tunnel segment strain using an adaptive machine learning model;Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards;2024-08-27