Author:
Dolatshahi-Zand Ali,Khalili-Damghani Kaveh
Subject
Industrial and Manufacturing Engineering,Safety, Risk, Reliability and Quality
Reference31 articles.
1. Solving a generalized precedence multi-objective multi-mode time-cost-quality trade-off project scheduling problem using a modified NSGA-II algorithm;Amiri;Int J Serv Oper Manag,2013
2. Practical SCADA for industry;Bailey,2003
3. Boyer SA. SCADA: supervisory control and data acquisition. ISA; 2004.
4. On the computational complexity of reliability redundancy allocation in a series system;Chern;Oper Res Lett,1992
Cited by
44 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献