1. Safety-related decision making at a nuclear power plant;Vaurio;Nuclear Engineering and Design,1998
2. USNRC Regulatory Guide 1.174. An approach for using probabilistic risk assessment in risk-informed decisions on plant-specific changes to the licensing basis; July 1998.
3. USNRC Regulatory Guide 1.175. An approach for plant-specific, risk-informed decision making: in-service testing; August 1998.
4. USNRC Regulatory Guide 1.177. An approach for plant-specific, risk-informed decision making: technical specifications; August 1998.
5. USNRC Regulatory Guide 1.178. An approach for plant-specific risk-informed decision making: in-service inspection of piping; July 1998.