1. Deterministic models for premature and postponed replacement;Adkins;Omega,2013
2. Ascher H, Feingold H. Repairable systems reliability. in: Lecture Notes in Statistics 7, Marcel Dekker, New York; 1984.
3. Badia FG, Berrade MD. Opportunity-based age replacement for a system under two types of failures. Edited by Martorell S, Soares CG, Barnett J. Safety, reliability and risk analysis: theory, methods and applications, vols 1–4; 2009. p. 575–80.
4. Competing risks and opportunistic informative maintenance;Bedford;Proc Inst Mech Eng Part O-J Risk Reliab,2009
5. The signal model: a model for competing risks of opportunistic maintenance;Bedford;Eur J Oper Res,2011