1. Carlson DD. Interim reliability evaluation program procedure guide, NUREG/CR-2728, SAND82-1100, US Nuclear Regulatory Commission, Washington, DC; 1983.
2. Breaking the logic loop to complete the probabilistic risk assessment;Coles,1989
3. Breaking the complex logical loops in Wolsong 2/3/4 PSA '95, Seoul, Korea;Kang,1995
4. How to avoid the generation of logic loops in the construction of fault trees;Demichela;Reliab Eng Safety,2004
5. ASME. Standard for probabilistic risk assessment for nuclear power plant applications, ASME RS-S-2002; 2002.