Author:
O’Dwyer Ciaran,Cormican Kathryn,Sampaio Suzana,Mitchell Sinead
Reference35 articles.
1. Hanna, Awad. S. (2016) “Benchmark performance metrics for integrated project delivery.” Journal of Construction Engineering and Management 142(9), pp. 1-9.
2. Ahmed, Salma and El-Sayegh, Sameh. (2020) “Critical review of the evolution of project delivery methods in the construction industry.” Buildings 11(1), p.11.
3. Mellado, Felipe and Lou, Eric C. (2020) “Building information modelling, lean and sustainability: An integration framework to promote performance improvements in the construction industry.” Sustainable cities and society 61, p.102355.
4. Kumara Silva, S., N F, W. B. and Lanka Arachchige J H, S. B. (2016) “Critical Success Factors: En Route for Success of Construction Projects.” International Journal of Business and Social Science 7(3), pp. 28-31. Available at: www.ijbssnet.com.
5. Piroozfar, Poorang, Eric RP Farr, Amir HM Zadeh, Sonia Timoteo Inacio, Steven Kilgallon, and Ruoyu Jin. (2019) “Facilitating building information modelling (BIM) using integrated project delivery (IPD): A UK perspective.” Journal of Building Engineering 26, 100907.