Author:
Pinto Pedro,Catorze Carolina,Guardão Luís,Lima Luís,Moutinho João,Dias João Pedro,Amândio Margarida,Martins Pedro,Silva Lígia,Rodrigues Ricardo
Funder
Programa Operacional Temático Factores de Competitividade
COMPETE 2020
Reference11 articles.
1. Lu, M., & Lam, H. C. (2005). “Optimized concrete delivery scheduling using combined simulation and genetic algorithms”. In Proceedings of the Winter Simulation Conference, 2005. (pp. 9-pp). IEEE;
2. "An optimal scheduling model for ready mixed concrete supply with overtime considerations";Yan;Automation in Construction,2007
3. Construction material supply chain process analysis and optimization;Pan;Journal of Civil Engineering and Management,2011
4. Zuo, Z., Huang, Y., Pan, X., Zhan, Y., Zhang, L., Li, X., ... & De Corte, W. (2021). Experimental research on remote real-time monitoring of concrete strength for highrise building machine during construction. Measurement, 178, 109430.
5. Hamooni, M., Maghrebi, M., Majrouhi Sardroud, J., & Kim, S. (2020). Extending BIM interoperability for real-time concrete formwork process monitoring. Applied Sciences, 10(3), 1085.