Author:
Lalmi Abdallah,Fernandes Gabriela,Souad Sassi Boudemagh
Reference91 articles.
1. "Determining the probability of project cost overruns,";Love;J. Constr. Eng. Manag.,2013
2. "Causes of delay in road construction projects,";Mahamid, A. Bruland;J. Manag. Eng.,2012
3. "The management of software engineering, Part I: Principles of software engineering,";Mills;IBM Syst. J.,1980
4. "Software engineering economics,";Boehm;IEEE Trans. Softw. Eng.,1984
5. "A spiral model of software development and enhancement,";Boehm;ACM SIGSOFT Softw. Eng. notes,1986
Cited by
31 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献