Author:
Bögl Michael,Gattinger Anna,Knospe Ionela,Schlenkrich Manuel,Stainko Roman
Reference18 articles.
1. “Sequencing with due-dates and early start times to minimize maximum tardiness.”;Baker;Naval Research Logistics Quarterly,1974
2. Braune R., Wagner S., and Affenzeller M. (2007) “Optimization Methods for Large-Scale Production Scheduling Problems.” 11th International Conference on Computer Aided Systems Theory, 812-819, February 12-16, 2007, Las Palmas de Gran Canaria, Spain.
3. “Resource-constrained project scheduling: Notation, classification, and methods.”;Brucker;European Journal of Operational Research,1999
4. “Applying tabu search to the job-shop scheduling problem.”;Dell’Amico;Annals of Operations Research,1993
5. “A hybrid genetic algorithm for the job shop scheduling problem.”;Gonçalves;European Journal of Operational Research,2005
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献