Author:
Islam Muhammad Saiful,Nepal Madhav
Reference39 articles.
1. An international comparative assessment of construction cost overruns for electricity infrastructure;Sovacool;Energy Res. Soc. Sci.,2014
2. IHS, “IHS Costs and Strategic Sourcing. Power Capital Costs Index and European Power Capital Costs Index. Available at https://www.ihs.com/info/cera/ihsindexes/index.html,” 2014.
3. M. Bosch-Rekveldt, Y. Jongkind, H. Mooi, H. Bakker, and A. Verbraeck, “Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework,” Int. J. Proj. Manag., vol. 29, no. 6, pp. 728-739, 2011.
4. The impact of external quality assurance of costs estimates on cost overruns: Empirical evidence from the norwegian road sector;Odeck;Eur. J. Transp. Infrastruct. Res.,2015
5. Y. Frimpong, J. Oluwoye, and L. Crawford, “Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study,” Int. J. Proj. Manag., vol. 21, no. 5, pp. 321-326, Jul. 2003.
Cited by
31 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献