1. Neoh ET. Adaptive Framework for Estimating Fabrication Time, PhD Thesis, Department of Mechanical Engineering, MIT, 1995
2. Muter S. Cost Comparisons of Alternate Designs: An Information Based Model, M.S. Thesis, Department of Mechanical Engineering, MIT, June 1993
3. Proctor MR, Metschan SL, Heiss CA, Klein HS. Cost Optimisation Software for Transport Aircraft Design and Evaluation (COSTADE)––Process Cost Analysis Database (PCAD) v 3.1 User's Manual, The Boeing Company, January 1997
4. Gutowski TG, Neoh E, Polgar KC. Adaptive Framework for Estimating Fabrication Time of Advanced Composites Manufacturing Processes, Massachusetts Institute of Technology, October 1995
5. Liquid moulding technologies;Rudd,1997