1. P. Brinckerhoff, Technical assessment of the operation of coal & gas fired plants, (2014) 44.
2. The real cost of on/off cycling;Lefton;Mod. Power Syst.,2006
3. Microstructure of CB2 steel before and after long-term creep tests;Jandová;Mater. Sci. Forum.,2014
4. Feasibility of MARBN steel for application to thick section boiler components in USC power plant at 650 C;Abe,2007
5. Microstructural Evaluation of 9Cr-3W-3Co-Nd-B heat-resistant steel (SAVE12AD) after long-term creep deformation;Hamaguchi,2017