1. Aminiam, H., Bazin, C., Hodouin, D., & Jacob, C. (1997) Modelling and simulation of a solvent extraction plant. Proceedings of the fifth southern hemisphere meeting on mineral technology, May 6–9, Argentina (pp. 337–340).
2. Hydrometallurgy evolution and milestones;Arbiter;Mining Engineering,1994
3. Bascur, O. A., & Kennedy, J. P. (1999). Real-time information management for improving productivity in metallurgical complexes. In D. Hodouin, C. Bazin, & A. Desbiens (Eds.). Control and optimization in minerals, metals, and materials processing. Metallurgical Society of the CIM, pp. 3–16.
4. Supervisory control at salvador flotation columns;Bergh;Minerals Engineering,1999
5. Bergh, L. (2000). Experience on SX/EW pilot plant automation, Proceedings of the future trends in automation in mineral and metal processing, 22–24 August, Espoo, Finland (pp. 357–360).