Author:
Logendran Rasaratnam,Carson Sara,Hanson Erik
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Economics and Econometrics,General Business, Management and Accounting
Reference25 articles.
1. Allison, J.D., 1990. Combining Petrov's heuristic and the CDS heuristic in group scheduling problems. Proceedings of the 12th Annual Conference on Computers and Industrial Engineering, Orlando, FL, pp. 457–461.
2. Al-Qattan, I., 1988. Designing GT cells enhanced by group scheduling. Proceedings of the IIE Integrated Systems Conference, pp. 25–30.
3. Heuristics for scheduling in a flow shop with multiple processors;Brah;European Journal of Operational Research,1991
4. A heuristic algorithm for the n job, m machine sequencing problem;Campbell;Management Science,1970
5. Heuristics for scheduling flexible flow lines;Ding;Computers and Industrial Engineering,1994
Cited by
67 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献