1. The overlapping production planning: A new approach of bounded capacity management;Bahroun;International Journal of Production Economics,2000
2. A tabu search approach for the flow shop scheduling problem;Ben-Daya;European Journal of Operational Research,1998
3. A new rank based version of the ant system—A computational study;Bullnheimer;Central European Journal of Operations Research,1999
4. Chan, F.T.S., Wong, T.C., Chan, P.L.Y., 2004. Equal size lot streaming to job-shop scheduling problem using genetic algorithms. In: Proceedings of the IEEE International Symposium on Intelligent Control—2004, ISIC, pp. 472–476.
5. Genetic algorithms applied to the continuous flow shop problem;Chen;Computers and Industrial Engineering,1996