1. Angerosa, A.M., 1999. The future looks bright for ERP. APICS The Performance Advantage, October 4–6.
2. A structured analysis of material requirements planning systems under combined demand and supply uncertainty;Brennan;International Journal of Production Research,1993
3. MRP performance effects due to lot size and planned lead time settings;Enns;International Journal of Production Research,2001
4. Frizelle, G., McFarlane, D., Bongaerts, L., 1998. Disturbance measurement in manufacturing production systems. Proceedings of the Advanced Summer Institute of the Esprit Network of Excellence in Intelligent Control and Integrated Manufacturing Systems, Bremen, 14–17 June, pp. 159–162.
5. A review of techniques for buffering against uncertainty with MRP systems;Guide;International Journal of Production Planning and Control,2000