1. Arcelor, 2004. Arcelor: a portrait, www.arcelor.com.
2. Basu, S., Dutta, G., Seth, R., 2004. A survey of the application of non-optimization techniques in an integrated steel plants, in preparation for submission to Interactive Transactions of Operation Research, www.iimahd.ernet.in/~goutam/survey2.htm.
3. Bekker, J., 2001. Discrete-event simulation in steel manufacturing: A case study. In: Proceedings of the International Conference on Competitive Manufacturing. Stellenbosch, South Africa, pp. 469–476.
4. Bellabdaoui, A., Fiordaliso, A., Teghem, A., 2003. A model for scheduling steelmaking-continuous casting production. Conference of Euro/Informs Joint International Meeting, 06–10 July, Istanbul, Turkey.
5. A linear programming model for integrated steel production and distribution planning;Chen;International Journal of Operations & Production Management,1997