1. A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams;Asad;Resour. Policy,2013
2. Net present value maximization model for optimum cut-off grade policy of open pit mining operations;Asad;J. South. Afr. Inst. Min. Metall.,2011
3. Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor;Bascetin;J. South. Afr. Inst. Min. Metall.,2007
4. An investigation on the effects of ore grade and particle libration size in gold recovery by coal–oil–gold agglomerate floatation;Cillingir,2000
5. Dagdelen, K., Kazuhiro, K., 2007. Cutoff grade optimization for large scale multi-mine, multi-process mining operations. In: Proceedings of the International Symposium Mine Planning and Equipment Selection. Curran Associates, Bangkok, pp. 226–233.