1. Mine plan selection under uncertainty;Abdel Sabour;Mining Technology: IMM Transactions Section A,2008
2. Valuing real capital investments using the least-squares Monte Carlo method;Abdel Sabour;Engineering Economist,2006
3. Akaike, A., Dagdelen, K., 1999. A strategic production scheduling method for an open pit mine. In: Proceedings of the 28th APCOM. Golden Colorado, USA, pp. 729–738.
4. Minable reserve estimation while determining ultimate pit limits (UPL) under price uncertainty by real option approach (ROA);Akbari;Archives of Mining Sciences,2009
5. Using a combination of genetic algorithm and the grid search method to determine optimum cutoff grades of multiple metal deposits;Ataei;International Journal of Surface MiningReclamation and Environment (IJSM),2004