1. Train headway simulation of 400 km/h high speed railway;An;Railw Transp Econ,2022
2. Moving model analysis of the slipstream and wake of a high-speed train;Bell;J. Wind Eng. Ind. Aerod.,2015
3. Railway Applications-Aerodynamics-Part4: Requirements and Test Procedures for Aerodynamics on Open Track,2021
4. Railway Applications-Aerodynamics-Part5: Requirements and Test Procedures for Aerodynamics on in Tunnels,2021
5. Micro-pressure wave countermeasures realized in the Katzenberg tunnel and introduction of a new German micro-pressure wave regulation;Deeg,2013