1. British Standards Institution, 2003. BS EN 12811-1, Temporary Works Equipment – Part 1: Scaffolds – Performance Requirements and General Design.
2. Wind tunnel experiment on wind pressures acting on the scaffolds in strong winds;Charuvisit;Journal of Wind Engineering, JAWE,2007
3. A refined working approach to the assessment of wind loads for equivalent static design;Cook;Journal of Wind Engineering and Industrial Aerodynamics,1979
4. Hino, Y., Phongkumsing, S., 2005. Study on the Estimation Method of Wind Pressure Acting on the temporary Scaffolds, Specific Research Reports of the National Institute of Industrial Safety, NIIS-SRR-NO. 31(in Japanese).
5. Equivalent time averaging in wind engineering;Holmes;Journal of Wind Engineering and Industrial Aerodynamics,1997