1. Compilation of laboratory data for buffer and backfill materials in the prototype repository;Börgesson,2001
2. Preliminary modelling of the water saturation phase of the buffer and backfill materials;Börgesson,1999
3. Installation of buffer, canisters, backfill and instruments in Section 1;Börgesson,2002
4. “Use of parallel computing and visualisation techniques in the simulation of large scale geoenvironmental engineering problems”;Cleall;Future Generation Computer Systems—The International Journal of Grid Computing: Theory, Methods and Application,2006
5. Test plan for the prototype repository;Dahlström,1998