1. Circulation ratio and carryunder in a PWR steam generator;Wazzan,1982
2. Steady state thermal measurements on the secondary side of a PWR steam generator;Procaccia,1982
3. PWR stem generator response to a scream at 50% load and an open grid transient;dePenguern,1982
4. Tests of types 51A and 51M steam generators at Bugey 4 and Tricastin 1 nuclear power plants;Procaccia;Electric Power Research Institute Report NP-1689, Project S154-1, Final Report,1982
5. Saturation pressure, circulation ratio and carryunder in a PWR steam generator: Tricastin 1 nuclear power plant;Wazzan;Nucl. Engrg. Des.,1984