Author:
Ave Giancarlo Dalle,Alici Mert,Harjunkoski Iiro,Engell Sebastian
Reference10 articles.
1. Resourcetask network formulations for industrial demand side management of a steel plant;Castro;Industrial and Engineering Chemistry Research,2013
2. From rescheduling to online scheduling;Gupta;Chemical Engineering Research and Design,2016
3. Industrial scheduling solution based on flexible heuristics;Harjunkoski;Computers and Chemical Engineering,2017
4. Scope for industrial applications of production scheduling models and solution methods;Harjunkoski;Computers and Chemical Engineering,2014
5. Realistic rescheduling: is it achievable?;Henning;FOCAPO 2016,2016
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献