1. Managed Pressure Drawdown in Utica/Point Pleasant with Case Studies;Belyadi,2016
2. Deep Dry Utica Well Spacing Analysis with Case Study;Belyadi,2016
3. Transient pressure analysis for fractured wells;Cinco-Ley;J. Petrol. Technol,1981
4. Modern Fracturing;Economides,2007
5. Proppant Agents;Ely,2012