1. Fujishita, K., Motomura, H., Terauchi, N., Shinozaki, H., Nakagawa, K., 1998. Application of the prelining method of fill type immediately after excavation to actual construction (in Japanese). Proc. JSCE 602(VI-40), 21–34
2. Injection Type Long-span Fore-piling Method (AGF method) Technical Reference(in Japanese),1997
3. Standard Specification of Tunnel (Mountain Tunneling Tunnel) and Explanation,1996
4. Karasawa, H., Suda, M., 1984. Orizume tunnel of Touhoku Motorway—overcome one of the poorest ground by changing to NATM (in Japanese). Doboku Sekou 25(15), 11–21
5. Evaluation of 3-lane tunnel with thin overburden through sandy ground (in Japanese)’;Koizumi;Tunnel Underground,1990