1. Reliability assurance for fatigue crack growth by repeated in-service inspections;Tanaka;Structural Safety,1991
2. Mizutani, M, Fujimoto, Y, Inspection strategy for deteriorating structures based on sequential cost minimization method. Part I: Framework of the method, Structural Safety and Reliability (Proceeding of ICOSSAR’98), pp. 1005-1012, Balkema, Rotterdam, 1994.
3. Fujimoto, Y, Mizutani, M, Inspection strategy for deteriorating structures based on sequential cost minimization method. Part II: Framework of the method, Structural Safety and Reliability (Proceeding of ICOSSAR’98), pp. 1015-1020, Balkema, Rotterdam, 1994.
4. Cost-based optimal relation between inspection time and assessment time for random fatigue crack growth;Tanaka;Prob. Engng. Mech.,1998
5. Toyoda-Makino, M, Tanaka, H, Optimal inspection strategy based on cost-minimization using a diffusive crack growth model, Structural Safety and Reliability (Proceedings of ICOSSAR’97) to appear.