1. R.J. Arbulu, I.D. Tommelein, Alternative supply chain configurations for engineered or catalogued made-to-order components: case study on pipe supports used in power plants, in: Proceedings of Tenth Annual Conference of International Group for Lean Construction (IGLC-10), August 2002, Brazil. , 2002 (accessed September 2005).
2. J. Elfving, I.D. Tommelein, G. Ballard, Reducing lead time for electrical switchgear, in: Tenth Annual Conference of the International Group for Lean Construction (IGLC-10), Gramado, Brazil, August 6–8, 2002, pp. 237–249.
3. Considering prework on industrial projects;Song;J. Constr. Eng. Man,2005
4. Developing material delivery processes in cooperation: an application example of the construction industry;Wegelius-Lehtonen;Int. J. Product. Econ.,1998
5. Wireless communication and computing at the construction jobsite;de la Garza;Automat. Construct.,1998