1. A framework for ICT-enabled real-time production planning and control;Arica;Advances in Manufacturing,2014
2. An agile scheduling and control approach in ETO construction supply chains;Dallasega;Computers in Industry,2019
3. Dallasega, P, Woschank, M, Ramingwong, S, Tippayawong, K, Chonsawat, N. Field study to identify requirements for smart logistics of European, US and Asian SMEs. Proceedings of the International Conference on Industrial Engineering and Operations Management Bangkok, Thailand, March 5-7, 2019. p. 844-855; 2019.
4. Requirement Analysis for the Design of Smart Logistics in SMEs;Dallasega,2020
5. Mass customization and its impact on assembly process’ complexity;Bednar;International Journal for Quality Research,2014