1. Al-Bahar, J. F. (1988). Risk management in construction project: A systematic analytical approach for contractors. Civil Engineering Department, Doctor of Philosophy: University of California at Berkeley.
2. A fuzzy-logic-based approach to qualitative risk modelling in the construction process;An;World Journal of Engineering,2005
3. Cost studies of building;Asworth,1998
4. Risk analysis in engineering and economics;Ayyub,2003
5. The maturing concept of estimating project cost contingency;Baccarini,2006