1. Introduction to aerospace structural analysis;Allen,1985
2. Hooker, A. W., (2005). Adaptive phased management: validation of cost estimating process for adaptive phased management of the long term management of used nuclear fuel. Associates Ltd., NWMO background papers, NWMO (Nuclear Waste Management Organization).
3. Composite materials for aircraft structures;Baker,2004
4. Bao, H. P. (2000). In-depth survey of cost/time estimating models, seminar. Multidisciplinary Optimization Branch, NASA Langley Research Center.
5. A knowledge-based engineering system to estimate manufacturing cost for composite structures;Choi;Journal of Aircraft, AIAA,2005