Subject
Artificial Intelligence,Computer Science Applications,General Engineering
Reference46 articles.
1. A solution procedure for preemptive multi-mode project scheduling problem with mode changeability to resumption;Afshar-Nadjafi;Appl. Comput. Inform.,2018
2. A genetic algorithm for mode identity and the resource constrained project scheduling problem;Afshar-Nadjafi;Sci. Iran.,2013
3. Alcaraz, J., Maroto, C., & Ruiz, R., (2003). Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms. Journal of the Operational Research Society, 54, 614-626. www.jstor.org/stable/4101753.
4. Construction and evaluation framework for a real-life project database;Batselier;Int. J. Project Manage.,2015
5. Heuristics for multimode scheduling problems with dedicated resources;Bianco;Eur. J. Oper. Res.,1998
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献