1. The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time;Allahverdi;International Journal of Advanced Manufacturing Technology,2008
2. Breusegem, E. V., Leenheer, M. D., Cheyns, J., Turck, F. D., Simeonidou, D. (2004). An OBS architecture for pervasive grid computing. In Workshop on optical burst switching. BROADNETS. California.
3. Sub-population genetic algorithm with mining gene structures for multiobjective flowshop scheduling problems;Chang;Expert Systems with Applications,2007
4. Multiobjective decision making: Theory and methodology;Chankong,1983
5. A comprehensive survey of evolutionary-based multiobjective optimization techniques;Coello;Knowledge and Information Systems,1999