1. Failure and reconstruction of a gantry crane ballasted track;Raymond;Can. Geotech. J.,2001
2. Double-pendulum gantry crane dynamics and control;Singhose,1998
3. Dynamic problems involved in operation of selected elements of crane installations used in the foundry engineering;Wolny;Arch. Metall. Mater.,2010
4. Dynamic optimization design of cranes based on human-crane-rail system dynamics and annoyance rate;Xin;Shock. Vib.,2017
5. Analysis of crane track degradation due to operation;Kulka;Eng. Fail. Anal.,2016