1. AESOP GmbH, 1993. SIMPLE++ Reference Manual. Stuttgart, Germany
2. Baker, K.R., 1974. Introduction to Sequencing and Scheduling. Wiley, New York
3. A simulation-based scheduler for flexible flowlines;Bengü;International Journal of Production Research,1994
4. Simulation aids JIT assembly line manufacture: A case study;Chan;International Journal of Operations and Production Management,1993
5. Costa, M.T., 1997. Balanceamento de uma Linha de Produção Flexı́vel, MSc thesis, Instituto Superior Técnico, Portugal