1. Brah, S.A., 1988. Scheduling in a Flow Shop with Multiple Processors, Dissertation Abstracts International 50, 1587B (University Microfilms No. 89-122667)
2. Brah, S.A., 1992. Complexity of the flow shop with multiple processors scheduling problem, and some dominance conditions, in: Phua, K.H. et al. (Ed.), Optimization: Techniques and Applications, vol. 1. World Scientific, Singapore, pp. 538–545
3. A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors;Brah;Production Planning and Control,1996
4. Branch and bound algorithm for the flow shop with multiple processors;Brah;European Journal of Operational Research,1991
5. Brah, S.A., Wheeler, G.E., 1992. Comparison of Local Scheduling Rules in a Flow Shop With Multiple Processors: A Simulation, Paper presented at the TIMS/ORSA Joint National Meeting in San Francisco, 1–4 November 1992