1. T. Ahn, S.S. Erengüc, Resource constrained project scheduling problem with multiple crashable modes, Technical Report, College of Business Administration, University of Florida, Gainesville, USA, 1995
2. H.N. Ahuja, Construction Performance Control by Networks, Wiley, New York, 1976
3. C. Akkan, Two heuristics based on a graph induction method for the discrete time–cost tradeoff problem, Working Paper, Koç University, Istanbul, 1997
4. R. Alvarez-Valdes, J.M. Tamarit, Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis, in: R. Słowiński, J. Wȩglarz (Eds.), Advances in Project Scheduling, Elsevier, Amsterdam, 1989, pp. 114–134
5. T. Baar, P. Brucker, S. Knust, Tabu-search algorithms for the resource-constrained project scheduling problem, Working Paper, Universität Osnabrück, 1997