1. Single machine flow-time scheduling with a single breakdown;Adiri;Acta Informatica,1989
2. S. Albers, G. Schmidt, Scheduling with unexpected machine breakdowns, Technical Report MPI-I-98-1-021, Max Planck Institut für Informatik, Saarbrücken, 1998
3. J. Blazewicz, J. Breit, P. Formanowicz, W. Kubiak, G. Schmidt, Heuristics for two machine flow shops with limited machine availability, Discussion Paper B-9802, Fachbereich Wirtschaftswissenschaft, University of Saarland, 1998
4. J. Blazewicz, M. Drozdowski, P. Formanowicz, W. Kubiak, G. Schmidt, Scheduling preemtable tasks on parallel processors with limited availability, unpublished
5. J. Blazewicz, K. Ecker, E. Pesch, G. Schmidt, J. Weglarz, Scheduling Computer and Manufacturing Processes, Springer, Berlin, 1996