Scheduling co-operating stacking cranes with predetermined container sequences
Author:
Funder
Deutsche Forschungsgemeinschaft
Publisher
Elsevier BV
Subject
Applied Mathematics,Discrete Mathematics and Combinatorics
Reference15 articles.
1. A graphical approach to production scheduling problems;Akers;Oper. Res.,1956
2. An efficient algorithm for the job-shop problem with two jobs;Brucker;European J. Oper. Res.,1988
3. The crane scheduling problem;Daganzo;Transp. Res. B,1989
4. Scheduling automated triple cross-over stacking cranes in a container yard;Dorndorf;OR Spectrum,2010
5. A geometric model and a graphical algorithm for a sequencing problem;Hardgrave;Oper. Res.,1963
Cited by 39 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Scheduling of twin automatic stacking cranes and automated guided vehicle considering buffer mode on automated container terminal;Computers & Industrial Engineering;2024-07
2. Design and Analysis of Structural Members of the Jib Crane;International Journal of Innovative Science and Research Technology (IJISRT);2024-06-24
3. A new solution approach for the twin yard crane scheduling problem in automated container terminals;Advanced Engineering Informatics;2023-08
4. Scheduling double-track gantry cranes to minimize the overall loading/ unloading time;Asia-Pacific Journal of Operational Research;2023-07-27
5. Multi agent deep reinforcement learning for resource allocation in container‐based clouds environments;Expert Systems;2023-06-10
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3